The civil engineering phase focused on designing and building reinforced concrete foundations to ensure the stability and durability of the photovoltaic structure. The foundations were positioned with precise spacing to match the structural layout and guarantee proper load distribution. Each footing was carefully dimensioned to withstand permanent loads from the structure and solar panels, as well as variable environmental loads such as wind. Reinforcement cages composed of vertical steel bars and stirrups were designed and installed to provide adequate resistance to mechanical stresses, while respecting concrete cover and anchoring requirements. Once poured and cured, these foundations formed a stable and reliable base for the installation of the supporting structure.